Wall Assembly Layers (Outside to Inside)

  1. Cladding/finish: Brick, stone, metal panel, stucco, siding
  2. Air space/drainage cavity: Typically 1" minimum for rainscreen
  3. Water-resistive barrier (WRB): Building wrap (Tyvek, etc.) or fluid-applied
  4. Sheathing: Plywood, OSB, gypsum, or continuous insulation board
  5. Continuous insulation (ci): Outboard of structure to reduce thermal bridging
  6. Structure: Studs, CMU, concrete
  7. Cavity insulation: Batt or blown-in between studs
  8. Vapor retarder: Placement varies by climate zone
  9. Interior finish: Gypsum board, paint

Vapor Retarder Placement by Climate

ClimateIECC ZonesVapor Retarder LocationRationale
Cold/very cold5, 6, 7, 8Interior side (warm-in-winter)Prevent interior moisture from condensing in wall
Mixed4Interior side or use smart retarderMoisture drives vary seasonally
Hot-humid1, 2, 3Exterior side (warm-in-summer) or omitPrevent exterior moisture from condensing on cooled interior
Marine4CInterior sideHeating-dominant climate

Rule of thumb: Place vapor retarder on the warm side of the wall assembly. Never sandwich vapor retarders on both sides (traps moisture).

Air Barrier vs Vapor Retarder

PropertyAir BarrierVapor Retarder
ControlsAir leakage (convection)Moisture diffusion (vapor drive)
ContinuityMust be continuous and sealed at all jointsCan have small gaps at seams
LocationAnywhere in assembly (typically outboard)Warm side of assembly
PermeanceNo specific perm rating requirementClass I: ≤0.1 perm; Class II: 0.1–1.0 perm; Class III: 1.0–10 perm
Material examplesSealed sheathing, fluid-applied membranesPolyethylene sheet, foil-faced insulation, kraft paper
Required by codeYes (IECC all zones)Zones 5+ (Class I or II on interior)

Common R-Values

MaterialR-Value per Inch
Fiberglass battR-3.2 to R-3.8
Cellulose (blown)R-3.5 to R-3.8
Mineral wool battR-3.0 to R-3.3
XPS (extruded polystyrene)R-5.0
EPS (expanded polystyrene)R-3.8 to R-4.4
PolyisocyanurateR-5.6 to R-6.5
Spray foam (closed-cell)R-6.0 to R-7.0
Spray foam (open-cell)R-3.5 to R-3.7
Concrete (solid)R-0.08
Brick (common)R-0.2
Gypsum board (1/2")R-0.45
Air space (3/4"–4")R-0.97 (non-reflective)
Interior air filmR-0.68
Exterior air filmR-0.17

Flashing Types and Locations

LocationPurposeMaterial
Window headDivert water over windowMetal, self-adhered membrane
Window sill (pan flashing)Catch water that penetrates jambsMetal or membrane with end dams
Base of wallRedirect cavity water to exterior via weep holesThrough-wall metal or membrane
Roof-to-wall intersectionPrevent water entry at transitionStep flashing + counterflashing
Shelf angleSupport masonry veneer at floor linesMetal angle with flashing above
Parapet capProtect top of parapet wallSheet metal coping

Drainage Plane Principles

  • Rainscreen: Pressure-equalized cavity behind cladding; drainage path for water that penetrates cladding
  • Barrier wall: Single waterproof surface (no drainage cavity)-e.g., single-wythe precast
  • Mass wall: Thick wall absorbs and slowly releases moisture (e.g., stone, CMU)
  • Weep holes: Open head joints at base of masonry every 24"–33" o.c.
  • Through-wall flashing: Must extend from interior face to exterior face with drip edge